Irrigation system design and execution of Hawiya Camp
....................................................................................................................................................


     Hawiya camp , An Aramco project, is a temporary residential facility
     facility for the employees and workers Of the Hawiya Gas Plant,
     located about 220 kilometers south of Dhahran (Saudi Arabia) ..

     The project consisted of two pads and a tent area, the
     Landscape consisted of perimeter barrier trees all along the site a
     11,000 m2 soccer field as well as soft cape planting at the administration
     and tent areas.

     Hawiya has a very low annual precipitation (about 63 mm) and groundwater resources
     from the aquifer is the main water supply source for about 90%
     of the total demands in the province; for this, the water source for irrigation
     originated from an installed R.O plant .

     My task for this project was to execute the landscape, derive the irrigation
     water requirements for the project, design and execute the irrigation
     system that consisted of; onsite Irrigation tanks and pumps and of a 110 mm
     uPVC irrigation mainline supplying water to the perimeter trees(Conocarpus.sp
     and Casuarina.sp ) ,irrigated by Bubblers; the soccer field was irrigated by
     rotors, and landscape areas were mostly irrigated by online drippers.




2012 Maamari. All rights reserved.
HOME    |       EDUCATION    |        PROJECTS     |        CONTACTS     |      WHERE AM I? |        LINKS
Halim Richard Maamari
Water and Landscapes
Hawiya Project.
Irrigation design of Hawiya soccer field.
First operation of soccer field irrigation system.
Irrigation mainline installation.